Cap-Haïtien: Prospection Mission Advances TAM-1 Submarine Cable Project
Officials identify potential sites for the landing of Haiti's TAM-1 submarine cable during a three-day technical mission in the North.
Haiti's Minister of Public Works, Transport and Communications, Joseph Almathe Pierre Louis, took part in a three-day prospection mission in Cap-Haïtien from November 18 to 20, 2026, to prepare for the arrival of the TAM-1 submarine telecommunications cable, according to icihaiti.com and juno7.ht. The mission followed working sessions held in Washington D.C. in early November around the HA-J0017 project. According to the reports, technical teams from several institutions—including the ministries of Public Works, Economy and Finance, and Interior, as well as SEMANAH and the IHSI—identified and documented sites that could host key infrastructure, establishing a pre-selection of two to three geo-referenced options for each facility: the beach manhole (BMH), the cable landing station (CLS) and interconnection points (POI). The pilot phase, dedicated to landing the cable at Cap-Haïtien with an initial capacity of 400 Gbps across three interconnection points, benefits from a first envelope of $55 million from the Inter-American Development Bank (IDB), with the financing contract being finalized. The broader digital infrastructure program is presented as a $200 million initiative over six years, ultimately intended to extend to all the country's provincial capitals and strengthen Haiti's international connectivity.